Triple
T6739745
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | international civil aviation network |
E154045
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | global transportation system |
C4130
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: global transportation system Context triple: [international civil aviation network, instanceOf, global transportation system]
-
A.
public transit system
A public transit system is an organized network of shared transportation services—such as buses, trains, subways, and trams—designed to move large numbers of people efficiently within and between urban and regional areas.
-
B.
transport infrastructure network
chosen
A transport infrastructure network is an interconnected system of physical routes and facilities—such as roads, railways, ports, and airports—designed to enable the efficient movement of people and goods across regions.
-
C.
global communication system
A global communication system is an interconnected network of technologies, protocols, and infrastructures that enables real-time exchange of information across the world regardless of geographic location.
-
D.
public transport information system
A public transport information system is a software platform that collects, processes, and disseminates real-time and scheduled data about public transit services to passengers, operators, and other stakeholders.
-
E.
public transportation infrastructure
Public transportation infrastructure encompasses the physical and organizational systems—such as buses, trains, stations, tracks, and supporting facilities—that enable the efficient movement of people via shared transit services.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c6880d84d8819095d19de2295f26ac |
completed | March 27, 2026, 1:37 p.m. |
Created at: March 27, 2026, 2:10 p.m.