Triple

T6734043
Position Surface form Disambiguated ID Type / Status
Subject Fondo de Estabilización Económica y Social E153707 entity
Predicate riskManagementGoal P73423 FINISHED
Object reduce exposure of the budget to copper price volatility LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: reduce exposure of the budget to copper price volatility | Statement: [Fondo de Estabilización Económica y Social, riskManagementGoal, reduce exposure of the budget to copper price volatility]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: riskManagementGoal
Context triple: [Fondo de Estabilización Económica y Social, riskManagementGoal, reduce exposure of the budget to copper price volatility]
  • A. riskManagement
    Indicates the implementation of strategies and actions to identify, assess, and mitigate potential risks associated with an entity or activity.
  • B. riskRequirement
    Indicates that one entity specifies or imposes a required level or type of risk consideration that another entity must meet or address.
  • C. riskManagedBy
    Indicates that the potential or identified risk is controlled, mitigated, or overseen through the actions, policies, or responsibilities of a specified managing entity.
  • D. riskMeasure
    Indicates a quantitative assessment of the level of risk associated with an entity, event, or situation.
  • E. riskBased
    Indicates that something is determined, prioritized, or managed according to the level or assessment of risk involved.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c6880bdd68819097de8b6099992682 completed March 27, 2026, 1:37 p.m.
NER Named-entity recognition batch_69c6d354177481908ab3cf5437c095e2 completed March 27, 2026, 6:58 p.m.
PD Predicate disambiguation batch_69c6d08e8a2c8190ae4e8d8c039be7ce completed March 27, 2026, 6:46 p.m.
PDg Predicate description generation batch_69c6d35134148190b49fb5c25a0f8ed4 completed March 27, 2026, 6:58 p.m.
Created at: March 27, 2026, 2:09 p.m.