Triple

T6701470
Position Surface form Disambiguated ID Type / Status
Subject Little Cottonwood Canyon E152889 entity
Predicate instanceOf P0 FINISHED
Object glacially carved canyon C14701 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: glacially carved canyon
Context triple: [Little Cottonwood Canyon, instanceOf, glacially carved canyon]
  • A. mountain gully
    A mountain gully is a narrow, steep-sided channel carved into a mountainside by concentrated runoff and erosion, often carrying water and debris during heavy rains or snowmelt.
  • B. glacial fjord system
    A glacial fjord system is a coastal landscape formed where glaciers carve deep, steep-sided valleys that are later flooded by the sea, creating interconnected basins, sills, and channels with distinct physical, chemical, and ecological characteristics.
  • C. river gorge
    A river gorge is a deep, narrow valley with steep, often rocky walls carved over time by the persistent erosive action of a river.
  • D. erosional landscape chosen
    An erosional landscape is a terrain shaped primarily by the removal and transport of soil and rock by agents such as water, wind, ice, and gravity, resulting in features like valleys, canyons, and cliffs.
  • E. submarine canyon
    A submarine canyon is a steep-sided underwater valley incised into the continental shelf and slope, often extending from the mouth of a river and serving as a major pathway for transporting sediments from shallow to deep ocean basins.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c68807adbc8190b8632df42b39eda0 completed March 27, 2026, 1:37 p.m.
Created at: March 27, 2026, 2:05 p.m.