Triple
T6686812
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | North–South Corridor |
E152118
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | infrastructure development program |
C18913
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: infrastructure development program Context triple: [North–South Corridor, instanceOf, infrastructure development program]
-
A.
infrastructure project
An infrastructure project is a large-scale, organized effort to plan, design, and construct foundational physical systems—such as transportation, utilities, and public facilities—that support a community’s or region’s economic and social activities.
-
B.
regional development programme
chosen
A regional development programme is a coordinated set of policies, investments, and initiatives designed to stimulate economic growth, improve infrastructure, and enhance social well-being within a specific geographic area.
-
C.
regional planning program
A regional planning program is an organized framework of policies, strategies, and actions designed to guide the coordinated development, land use, infrastructure, and resource management of a specific geographic area over time.
-
D.
development initiative
A development initiative is a coordinated set of actions and resources aimed at improving social, economic, or environmental conditions within a specific community, sector, or region.
-
E.
public transit and highway improvement program
A public transit and highway improvement program is a coordinated set of projects and policies designed to enhance the capacity, safety, efficiency, and accessibility of transportation networks through upgrades to roads, highways, and mass transit systems.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c687f9977c819097e7f5ada4fe522e |
completed | March 27, 2026, 1:36 p.m. |
Created at: March 27, 2026, 2:04 p.m.