Triple

T6686812
Position Surface form Disambiguated ID Type / Status
Subject North–South Corridor E152118 entity
Predicate instanceOf P0 FINISHED
Object infrastructure development program C18913 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: infrastructure development program
Context triple: [North–South Corridor, instanceOf, infrastructure development program]
  • A. infrastructure project
    An infrastructure project is a large-scale, organized effort to plan, design, and construct foundational physical systems—such as transportation, utilities, and public facilities—that support a community’s or region’s economic and social activities.
  • B. regional development programme chosen
    A regional development programme is a coordinated set of policies, investments, and initiatives designed to stimulate economic growth, improve infrastructure, and enhance social well-being within a specific geographic area.
  • C. regional planning program
    A regional planning program is an organized framework of policies, strategies, and actions designed to guide the coordinated development, land use, infrastructure, and resource management of a specific geographic area over time.
  • D. development initiative
    A development initiative is a coordinated set of actions and resources aimed at improving social, economic, or environmental conditions within a specific community, sector, or region.
  • E. public transit and highway improvement program
    A public transit and highway improvement program is a coordinated set of projects and policies designed to enhance the capacity, safety, efficiency, and accessibility of transportation networks through upgrades to roads, highways, and mass transit systems.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c687f9977c819097e7f5ada4fe522e completed March 27, 2026, 1:36 p.m.
Created at: March 27, 2026, 2:04 p.m.