Triple

T6682570
Position Surface form Disambiguated ID Type / Status
Subject Sydney Harbour Bridge Climb E152019 entity
Predicate instanceOf P0 FINISHED
Object guided tour C9983 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: guided tour
Context triple: [Sydney Harbour Bridge Climb, instanceOf, guided tour]
  • A. self-guided tour route
    A self-guided tour route is a predefined path or itinerary that visitors follow independently, using provided materials or digital tools for information and navigation without a live guide.
  • B. tourist excursion chosen
    A tourist excursion is a planned short-term trip or outing designed to provide travelers with leisure, sightseeing, cultural experiences, or recreational activities at one or more destinations.
  • C. travel guide series
    A travel guide series is a collection of related publications that provide practical information, recommendations, and cultural context to help travelers plan and navigate trips to various destinations.
  • D. tourist attraction
    A tourist attraction is a place, event, or feature that draws visitors due to its cultural, historical, natural, recreational, or entertainment value.
  • E. online city guide
    An online city guide is a digital platform that provides curated information, maps, and recommendations about a city's attractions, services, events, and local businesses to help users explore and navigate the area.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c687f9977c819097e7f5ada4fe522e completed March 27, 2026, 1:36 p.m.
Created at: March 27, 2026, 2:04 p.m.