Triple

T6665094
Position Surface form Disambiguated ID Type / Status
Subject Warner Robins Area Transportation Study MPO E151580 entity
Predicate instanceOf P0 FINISHED
Object regional planning body C1090 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: regional planning body
Context triple: [Warner Robins Area Transportation Study MPO, instanceOf, regional planning body]
  • A. regional planning agency chosen
    A regional planning agency is an organization responsible for coordinating land use, transportation, infrastructure, and environmental planning across multiple jurisdictions within a defined geographic region.
  • B. regional planning program
    A regional planning program is an organized framework of policies, strategies, and actions designed to guide the coordinated development, land use, infrastructure, and resource management of a specific geographic area over time.
  • C. regional planner
    A regional planner is a professional who analyzes and coordinates land use, infrastructure, resources, and policies across multiple communities or jurisdictions to guide sustainable and balanced regional development.
  • D. planned regional development bank
    A planned regional development bank is a proposed financial institution designed to mobilize and allocate long-term capital within a specific geographic region to support sustainable economic growth, infrastructure, and social development projects.
  • E. planning commission
    A planning commission is a governmental or advisory body responsible for reviewing, guiding, and making recommendations on land use, development proposals, and long-term community planning policies.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c687f71fc081909dbd45d6377f6045 completed March 27, 2026, 1:36 p.m.
Created at: March 27, 2026, 2:02 p.m.