Triple

T6657972
Position Surface form Disambiguated ID Type / Status
Subject SR 99 E151395 entity
Predicate hasJunctionWith P1018 FINISHED
Object SR 525
SR 525 is a state highway in Washington that connects the Mukilteo ferry terminal to Interstate 5 and serves as a key route through Snohomish County.
E613321 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: SR 525 | Statement: [SR 99, hasJunctionWith, SR 525]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: SR 525
Context triple: [SR 99, hasJunctionWith, SR 525]
  • A. SR 502
    SR 502 is a state highway in New Mexico that serves as a key route connecting Los Alamos to other major roads in the region.
  • B. SR 54
    SR 54 is a state highway in Georgia that connects several communities in the western part of the state, including areas around Atlanta.
  • C. SR 55
    SR 55 is a state highway in Georgia that serves as a regional connector route through several counties in the state.
  • D. SR 509
    SR 509 is a state highway in Washington that serves as a key north–south route connecting cities in the Puget Sound region, including Tacoma and Seattle’s southern suburbs.
  • E. SR 518
    SR 518 is a short state highway in Washington that connects Seattle–Tacoma International Airport to major routes like I-5 and I-405.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: SR 525
Triple: [SR 99, hasJunctionWith, SR 525]
Generated description
SR 525 is a state highway in Washington that connects the Mukilteo ferry terminal to Interstate 5 and serves as a key route through Snohomish County.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: SR 525
Target entity description: SR 525 is a state highway in Washington that connects the Mukilteo ferry terminal to Interstate 5 and serves as a key route through Snohomish County.
  • A. SR 502
    SR 502 is a state highway in New Mexico that serves as a key route connecting Los Alamos to other major roads in the region.
  • B. SR 54
    SR 54 is a state highway in Georgia that connects several communities in the western part of the state, including areas around Atlanta.
  • C. SR 55
    SR 55 is a state highway in Georgia that serves as a regional connector route through several counties in the state.
  • D. SR 509
    SR 509 is a state highway in Washington that serves as a key north–south route connecting cities in the Puget Sound region, including Tacoma and Seattle’s southern suburbs.
  • E. SR 518
    SR 518 is a short state highway in Washington that connects Seattle–Tacoma International Airport to major routes like I-5 and I-405.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c687f5fac48190a09e4838d9c6b45d completed March 27, 2026, 1:36 p.m.
NER Named-entity recognition batch_69c6b06f3da88190b17649f44ee93fd1 completed March 27, 2026, 4:29 p.m.
NED1 Entity disambiguation (via context triple) batch_69c7007347cc8190a15b4218bb3b7074 completed March 27, 2026, 10:10 p.m.
NEDg Description generation batch_69c70262f3e48190b544be536ee0b674 completed March 27, 2026, 10:19 p.m.
NED2 Entity disambiguation (via description) batch_69c70311418c8190a902cf21187fdc51 completed March 27, 2026, 10:22 p.m.
Created at: March 27, 2026, 2:01 p.m.