Triple

T6639740
Position Surface form Disambiguated ID Type / Status
Subject Cronese Dry Lake E150555 entity
Predicate near P350 FINISHED
Object Interstate 15 E42837 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Interstate 15 | Statement: [Cronese Dry Lake, near, Interstate 15]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Interstate 15
Context triple: [Cronese Dry Lake, near, Interstate 15]
  • A. Interstate 15 chosen
    Interstate 15 is a major north–south U.S. highway running from Southern California through the Intermountain West to the Canadian border, serving key cities such as Las Vegas and Salt Lake City.
  • B. Interstate 25
    Interstate 25 is a major north–south U.S. highway running through the Rocky Mountain region, connecting cities from New Mexico through Colorado to Wyoming.
  • C. Interstate 105
    Interstate 105 is a major east–west freeway in Los Angeles County that connects Los Angeles International Airport to the I-605 corridor and other regional highways.
  • D. Interstate 40
    Interstate 40 is a major east–west transcontinental highway in the United States that stretches from California to North Carolina, passing through several key cities and states.
  • E. Interstate 17
    Interstate 17 is a primary north–south freeway in Arizona that connects Phoenix with Flagstaff and serves as a key route to northern Arizona destinations.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c687f0ceb08190bf40807bfc605fa5 completed March 27, 2026, 1:36 p.m.
NER Named-entity recognition batch_69c6aff1fe8081908c32db341b0fb354 completed March 27, 2026, 4:27 p.m.
NED1 Entity disambiguation (via context triple) batch_69c72f6db074819089795c29cb4f6699 completed March 28, 2026, 1:31 a.m.
Created at: March 27, 2026, 2 p.m.