Triple
T6637186
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Metro line L9 Sud |
E150486
|
entity |
| Predicate | connectsWith |
P37
|
FINISHED |
| Object |
L2 at Parc Logístic (planned future connection to L2 extension)
L2 at Parc Logístic is a planned future station on Barcelona’s Metro Line 2, intended to provide an interchange with the existing Parc Logístic stop on Line 9 Sud as part of a network extension.
|
E599005
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: L2 at Parc Logístic (planned future connection to L2 extension) | Statement: [Metro line L9 Sud, connectsWith, L2 at Parc Logístic (planned future connection to L2 extension)]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: L2 at Parc Logístic (planned future connection to L2 extension) Context triple: [Metro line L9 Sud, connectsWith, L2 at Parc Logístic (planned future connection to L2 extension)]
-
A.
Capital Line South Extension (under construction)
The Capital Line South Extension (under construction) is a planned southern expansion of Edmonton’s light rail transit network intended to improve rapid transit access to growing suburban communities.
-
B.
Metro Line 2 at Tasqueña
Metro Line 2 at Tasqueña is a major Mexico City Metro terminal station in the south of the city that serves as an important transfer point between the metro network and the Tren Ligero light rail system.
-
C.
Ligne 2
Ligne 2 is a Paris Métro line forming a semicircular route through northern Paris, known for serving major districts such as Pigalle and Belleville.
-
D.
LRT Line 2
LRT Line 2 is an elevated rapid transit line in Metro Manila, Philippines, running east–west and serving major areas including Quezon City, Manila, and Pasig.
-
E.
Metro L Line (under construction or reconfiguration)
The Metro L Line is a light rail line in Los Angeles County’s Metro Rail system that is currently being reconfigured as part of a broader network restructuring and expansion.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: L2 at Parc Logístic (planned future connection to L2 extension) Triple: [Metro line L9 Sud, connectsWith, L2 at Parc Logístic (planned future connection to L2 extension)]
Generated description
L2 at Parc Logístic is a planned future station on Barcelona’s Metro Line 2, intended to provide an interchange with the existing Parc Logístic stop on Line 9 Sud as part of a network extension.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: L2 at Parc Logístic (planned future connection to L2 extension) Target entity description: L2 at Parc Logístic is a planned future station on Barcelona’s Metro Line 2, intended to provide an interchange with the existing Parc Logístic stop on Line 9 Sud as part of a network extension.
-
A.
Capital Line South Extension (under construction)
The Capital Line South Extension (under construction) is a planned southern expansion of Edmonton’s light rail transit network intended to improve rapid transit access to growing suburban communities.
-
B.
Metro Line 2 at Tasqueña
Metro Line 2 at Tasqueña is a major Mexico City Metro terminal station in the south of the city that serves as an important transfer point between the metro network and the Tren Ligero light rail system.
-
C.
Ligne 2
Ligne 2 is a Paris Métro line forming a semicircular route through northern Paris, known for serving major districts such as Pigalle and Belleville.
-
D.
LRT Line 2
LRT Line 2 is an elevated rapid transit line in Metro Manila, Philippines, running east–west and serving major areas including Quezon City, Manila, and Pasig.
-
E.
Metro L Line (under construction or reconfiguration)
The Metro L Line is a light rail line in Los Angeles County’s Metro Rail system that is currently being reconfigured as part of a broader network restructuring and expansion.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c687f0ceb08190bf40807bfc605fa5 |
completed | March 27, 2026, 1:36 p.m. |
| NER | Named-entity recognition | batch_69c6afcf439c8190b9334b34774da821 |
completed | March 27, 2026, 4:26 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69c6cbf71874819080cc89b6740b1567 |
completed | March 27, 2026, 6:27 p.m. |
| NEDg | Description generation | batch_69c6cd0bb0e48190ae51fde4b4631f65 |
completed | March 27, 2026, 6:31 p.m. |
| NED2 | Entity disambiguation (via description) | batch_69c6cd90b9208190b4c5bf44db073314 |
completed | March 27, 2026, 6:33 p.m. |
Created at: March 27, 2026, 1:59 p.m.