Triple

T6633510
Position Surface form Disambiguated ID Type / Status
Subject Sail Hybrid E150385 entity
Predicate instanceOf P0 FINISHED
Object sustainable design project C20840 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: sustainable design project
Context triple: [Sail Hybrid, instanceOf, sustainable design project]
  • A. interior design project
    An interior design project is a planned and coordinated process of transforming an interior space’s function, aesthetics, and atmosphere through the selection and arrangement of materials, furnishings, colors, lighting, and spatial layouts to meet specific client needs and style goals.
  • B. urban design project
    An urban design project is a coordinated planning and design effort that shapes the physical form, public spaces, infrastructure, and land use of a specific urban area to improve its functionality, aesthetics, and livability.
  • C. design practice
    Design practice is the systematic, iterative application of design methods, tools, and principles to solve problems, create meaningful experiences, and refine solutions in real-world contexts.
  • D. garden design project
    A garden design project is a planned endeavor that organizes and coordinates the creation or transformation of an outdoor space to achieve specific aesthetic, functional, and environmental goals.
  • E. multidisciplinary design studio
    A multidisciplinary design studio is a collaborative creative environment where professionals from diverse fields—such as graphic, product, interaction, and architectural design—work together to research, conceptualize, and develop integrated design solutions.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c687f0ceb08190bf40807bfc605fa5 completed March 27, 2026, 1:36 p.m.
Created at: March 27, 2026, 1:59 p.m.