Triple

T6626438
Position Surface form Disambiguated ID Type / Status
Subject Sloan Valve Company E149815 entity
Predicate instanceOf P0 FINISHED
Object plumbing manufacturer C5242 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: plumbing manufacturer
Context triple: [Sloan Valve Company, instanceOf, plumbing manufacturer]
  • A. irrigation equipment manufacturer
    An irrigation equipment manufacturer is a company that designs, produces, and supplies systems and components used to deliver water efficiently to agricultural, landscaping, or industrial areas.
  • B. manufacturing company
    A manufacturing company is an organization that transforms raw materials or components into finished goods through industrial processes, machinery, and labor for sale to other businesses or consumers.
  • C. ropeway manufacturer
    A ropeway manufacturer is a company that designs, engineers, and produces aerial cable transport systems such as gondolas, chairlifts, and cable cars for passenger or material transportation.
  • D. manufacturer chosen
    A manufacturer is an entity that produces goods from raw materials or components, typically using machinery and labor, to supply products for distribution and sale.
  • E. manufacturing plant
    A manufacturing plant is a large-scale industrial facility where raw materials are transformed through organized processes, machinery, and labor into finished goods or components.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c687ee50048190aa151765bef16193 completed March 27, 2026, 1:36 p.m.
Created at: March 27, 2026, 1:58 p.m.