Triple

T6608090
Position Surface form Disambiguated ID Type / Status
Subject Dock10 E149168 entity
Predicate instanceOf P0 FINISHED
Object post-production facility C9106 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: post-production facility
Context triple: [Dock10, instanceOf, post-production facility]
  • A. post-production process
    The post-production process is the stage in media creation where recorded material is edited, enhanced, and finalized through tasks such as cutting, sound design, visual effects, color correction, and mastering before distribution.
  • B. film post-production company chosen
    A film post-production company is a business that specializes in editing, visual effects, sound design, color grading, and final mastering to complete and polish film and video projects after principal photography.
  • C. television post-production company
    A television post-production company is a specialized business that handles the editing, visual effects, sound design, color correction, and final assembly of television content after filming is completed.
  • D. television production centre
    A television production centre is a facility equipped with studios, control rooms, and technical infrastructure where television programs are planned, recorded, edited, and broadcast.
  • E. production facility
    A production facility is a physical site equipped with machinery, resources, and personnel dedicated to manufacturing goods or processing materials at scale.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c687eaa7508190bb58ce2aa02039b3 completed March 27, 2026, 1:36 p.m.
Created at: March 27, 2026, 1:57 p.m.