Triple
T6598275
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Carillon generating station |
E148530
|
entity |
| Predicate | partOf |
P40
|
FINISHED |
| Object |
Ottawa River hydropower system
The Ottawa River hydropower system is an interconnected network of dams and generating stations along the Ottawa River that produces hydroelectric power for surrounding regions in Canada.
|
E601676
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Ottawa River hydropower system | Statement: [Carillon generating station, partOf, Ottawa River hydropower system]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Ottawa River hydropower system Context triple: [Carillon generating station, partOf, Ottawa River hydropower system]
-
A.
Niagara River hydropower system
The Niagara River hydropower system is a large binational network of dams, tunnels, and generating stations on the Niagara River that harnesses the river’s flow and Niagara Falls to produce significant hydroelectric power for Canada and the United States.
-
B.
Muskrat Falls Generating Station
Muskrat Falls Generating Station is a large hydroelectric power facility on the lower Churchill River in Labrador, Canada, developed to supply renewable electricity to Newfoundland and Labrador and beyond.
-
C.
Hydro-Québec James Bay Project
The Hydro-Québec James Bay Project is a massive hydroelectric development in northern Quebec comprising a complex of dams, reservoirs, and power stations that harness the region’s large rivers to generate electricity.
-
D.
Sir Adam Beck Hydroelectric Generating Stations
The Sir Adam Beck Hydroelectric Generating Stations are a major complex of hydroelectric power plants on the Niagara River in Ontario, Canada, that harness the flow of Niagara Falls to generate electricity for the province.
-
E.
Niagara District
The Niagara District was a historical administrative region in Upper Canada that encompassed the town of Newark (now Niagara-on-the-Lake) and surrounding areas along the Niagara River.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Ottawa River hydropower system Triple: [Carillon generating station, partOf, Ottawa River hydropower system]
Generated description
The Ottawa River hydropower system is an interconnected network of dams and generating stations along the Ottawa River that produces hydroelectric power for surrounding regions in Canada.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Ottawa River hydropower system Target entity description: The Ottawa River hydropower system is an interconnected network of dams and generating stations along the Ottawa River that produces hydroelectric power for surrounding regions in Canada.
-
A.
Niagara River hydropower system
The Niagara River hydropower system is a large binational network of dams, tunnels, and generating stations on the Niagara River that harnesses the river’s flow and Niagara Falls to produce significant hydroelectric power for Canada and the United States.
-
B.
Muskrat Falls Generating Station
Muskrat Falls Generating Station is a large hydroelectric power facility on the lower Churchill River in Labrador, Canada, developed to supply renewable electricity to Newfoundland and Labrador and beyond.
-
C.
Hydro-Québec James Bay Project
The Hydro-Québec James Bay Project is a massive hydroelectric development in northern Quebec comprising a complex of dams, reservoirs, and power stations that harness the region’s large rivers to generate electricity.
-
D.
Sir Adam Beck Hydroelectric Generating Stations
The Sir Adam Beck Hydroelectric Generating Stations are a major complex of hydroelectric power plants on the Niagara River in Ontario, Canada, that harness the flow of Niagara Falls to generate electricity for the province.
-
E.
Niagara District
The Niagara District was a historical administrative region in Upper Canada that encompassed the town of Newark (now Niagara-on-the-Lake) and surrounding areas along the Niagara River.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c687e7b8688190811ffee72e096468 |
completed | March 27, 2026, 1:36 p.m. |
| NER | Named-entity recognition | batch_69c6aeee738081908913f4f8c6699bd9 |
completed | March 27, 2026, 4:23 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69c6cbc3ee188190a285110707a895b6 |
completed | March 27, 2026, 6:26 p.m. |
| NEDg | Description generation | batch_69c6cd09753c81909df166156ffbf82a |
completed | March 27, 2026, 6:31 p.m. |
| NED2 | Entity disambiguation (via description) | batch_69c6ce9ba47c819091496c87117e7a03 |
completed | March 27, 2026, 6:38 p.m. |
Created at: March 27, 2026, 1:56 p.m.