Triple

T6574154
Position Surface form Disambiguated ID Type / Status
Subject Newark–World Trade Center line E155515 entity
Predicate currentTerminusOpened P70253 FINISHED
Object World Trade Center station in 1971 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: World Trade Center station in 1971 | Statement: [Newark–World Trade Center line, currentTerminusOpened, World Trade Center station in 1971]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: currentTerminusOpened
Context triple: [Newark–World Trade Center line, currentTerminusOpened, World Trade Center station in 1971]
  • A. openedAsTerminus chosen
    Indicates that a transportation line or route was initially opened with this location serving as its end-point terminus.
  • B. isOpenTo
    Indicates that one entity is receptive, willing, or available to consider, accept, or engage with another entity or proposal.
  • C. openStatus
    Indicates whether an entity (such as a place, service, or resource) is currently open or available for use.
  • D. closedAsTerminal
    Indicates that a process, case, or interaction has been concluded in a final, non-reopenable (terminal) state.
  • E. openedForCurrentUse
    Indicates that an entity has been opened and is currently available for its intended use or operation.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c688151254819080387f87deab8fa7 completed March 27, 2026, 1:37 p.m.
NER Named-entity recognition batch_69c6cc9c6cb0819084fec8e0beb430de completed March 27, 2026, 6:29 p.m.
PD Predicate disambiguation batch_69c6acf93cb48190b54f5dd6febd34dc completed March 27, 2026, 4:14 p.m.
Created at: March 27, 2026, 1:53 p.m.