Triple
T6563634
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | 蔚山 |
E153846
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | 工业城市 |
C8405
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: 工业城市 Context triple: [蔚山, instanceOf, 工业城市]
-
A.
industrial center
chosen
An industrial center is a concentrated area where manufacturing, production, and related economic activities are clustered, supported by specialized infrastructure and labor.
-
B.
industrial town
An industrial town is a settlement whose economy and landscape are dominated by factories, warehouses, and related infrastructure supporting manufacturing and heavy industry.
-
C.
industrial district
An industrial district is a designated urban or regional area characterized by a high concentration of manufacturing, warehousing, and related industrial activities supported by specialized infrastructure and services.
-
D.
former industrial town
A former industrial town is a community whose economy and identity were once dominated by manufacturing or heavy industry but have since declined or transitioned to other forms of economic activity.
-
E.
industrial park
An industrial park is a planned and zoned area of land designated for industrial development, typically providing shared infrastructure, utilities, and transportation access for manufacturing, warehousing, and related businesses.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c6880cb35881909b763eb0125236b9 |
completed | March 27, 2026, 1:37 p.m. |
Created at: March 27, 2026, 1:52 p.m.