Triple

T6558424
Position Surface form Disambiguated ID Type / Status
Subject Interstate 8 E152509 entity
Predicate hasAbbreviation P43 FINISHED
Object I-8
I-8 is a major east–west Interstate Highway in the southwestern United States that runs between southern California and Arizona.
E604874 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: I-8 | Statement: [Interstate 8, hasAbbreviation, I-8]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: I-8
Context triple: [Interstate 8, hasAbbreviation, I-8]
  • A. I-405
    I-405 is a major auxiliary Interstate Highway that serves as a heavily traveled bypass and commuter route around parts of the greater Los Angeles and Seattle metropolitan areas.
  • B. I-335
    I-335 is a segment of the Kansas Turnpike that forms part of the Interstate Highway System, connecting Emporia and Topeka in eastern Kansas.
  • C. Interstate 840
    Interstate 840 is a beltway highway forming part of the loop around Greensboro in North Carolina, helping to route traffic around the city and connect with other major interstates.
  • D. I-235
    I-235 is an auxiliary Interstate Highway that serves as a bypass route around Wichita, Kansas.
  • E. I-375
    I-375 is a short auxiliary Interstate Highway in downtown Detroit, Michigan, connecting I-75 to the city's central business district and riverfront.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: I-8
Triple: [Interstate 8, hasAbbreviation, I-8]
Generated description
I-8 is a major east–west Interstate Highway in the southwestern United States that runs between southern California and Arizona.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: I-8
Target entity description: I-8 is a major east–west Interstate Highway in the southwestern United States that runs between southern California and Arizona.
  • A. I-405
    I-405 is a major auxiliary Interstate Highway that serves as a heavily traveled bypass and commuter route around parts of the greater Los Angeles and Seattle metropolitan areas.
  • B. I-335
    I-335 is a segment of the Kansas Turnpike that forms part of the Interstate Highway System, connecting Emporia and Topeka in eastern Kansas.
  • C. Interstate 840
    Interstate 840 is a beltway highway forming part of the loop around Greensboro in North Carolina, helping to route traffic around the city and connect with other major interstates.
  • D. I-235
    I-235 is an auxiliary Interstate Highway that serves as a bypass route around Wichita, Kansas.
  • E. I-375
    I-375 is a short auxiliary Interstate Highway in downtown Detroit, Michigan, connecting I-75 to the city's central business district and riverfront.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c688058d6881908c19b309cc55dbfa completed March 27, 2026, 1:37 p.m.
NER Named-entity recognition batch_69c6ae202e508190a08a0c0584648b83 completed March 27, 2026, 4:19 p.m.
NED1 Entity disambiguation (via context triple) batch_69c6d55c817481908f570b85a6b407f9 completed March 27, 2026, 7:07 p.m.
NEDg Description generation batch_69c6d6dad26481908ac4bc0ed703091b completed March 27, 2026, 7:13 p.m.
NED2 Entity disambiguation (via description) batch_69c6d84076d48190ada0903af49613de completed March 27, 2026, 7:19 p.m.
Created at: March 27, 2026, 1:52 p.m.