Triple
T6558424
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Interstate 8 |
E152509
|
entity |
| Predicate | hasAbbreviation |
P43
|
FINISHED |
| Object |
I-8
I-8 is a major east–west Interstate Highway in the southwestern United States that runs between southern California and Arizona.
|
E604874
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: I-8 | Statement: [Interstate 8, hasAbbreviation, I-8]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: I-8 Context triple: [Interstate 8, hasAbbreviation, I-8]
-
A.
I-405
I-405 is a major auxiliary Interstate Highway that serves as a heavily traveled bypass and commuter route around parts of the greater Los Angeles and Seattle metropolitan areas.
-
B.
I-335
I-335 is a segment of the Kansas Turnpike that forms part of the Interstate Highway System, connecting Emporia and Topeka in eastern Kansas.
-
C.
Interstate 840
Interstate 840 is a beltway highway forming part of the loop around Greensboro in North Carolina, helping to route traffic around the city and connect with other major interstates.
-
D.
I-235
I-235 is an auxiliary Interstate Highway that serves as a bypass route around Wichita, Kansas.
-
E.
I-375
I-375 is a short auxiliary Interstate Highway in downtown Detroit, Michigan, connecting I-75 to the city's central business district and riverfront.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: I-8 Triple: [Interstate 8, hasAbbreviation, I-8]
Generated description
I-8 is a major east–west Interstate Highway in the southwestern United States that runs between southern California and Arizona.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: I-8 Target entity description: I-8 is a major east–west Interstate Highway in the southwestern United States that runs between southern California and Arizona.
-
A.
I-405
I-405 is a major auxiliary Interstate Highway that serves as a heavily traveled bypass and commuter route around parts of the greater Los Angeles and Seattle metropolitan areas.
-
B.
I-335
I-335 is a segment of the Kansas Turnpike that forms part of the Interstate Highway System, connecting Emporia and Topeka in eastern Kansas.
-
C.
Interstate 840
Interstate 840 is a beltway highway forming part of the loop around Greensboro in North Carolina, helping to route traffic around the city and connect with other major interstates.
-
D.
I-235
I-235 is an auxiliary Interstate Highway that serves as a bypass route around Wichita, Kansas.
-
E.
I-375
I-375 is a short auxiliary Interstate Highway in downtown Detroit, Michigan, connecting I-75 to the city's central business district and riverfront.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c688058d6881908c19b309cc55dbfa |
completed | March 27, 2026, 1:37 p.m. |
| NER | Named-entity recognition | batch_69c6ae202e508190a08a0c0584648b83 |
completed | March 27, 2026, 4:19 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69c6d55c817481908f570b85a6b407f9 |
completed | March 27, 2026, 7:07 p.m. |
| NEDg | Description generation | batch_69c6d6dad26481908ac4bc0ed703091b |
completed | March 27, 2026, 7:13 p.m. |
| NED2 | Entity disambiguation (via description) | batch_69c6d84076d48190ada0903af49613de |
completed | March 27, 2026, 7:19 p.m. |
Created at: March 27, 2026, 1:52 p.m.