Triple

T6554799
Position Surface form Disambiguated ID Type / Status
Subject Vakhsh River E152418 entity
Predicate countryHydropowerImportance P20913 FINISHED
Object one of the main hydropower rivers of Tajikistan LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: one of the main hydropower rivers of Tajikistan | Statement: [Vakhsh River, countryHydropowerImportance, one of the main hydropower rivers of Tajikistan]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: countryHydropowerImportance
Context triple: [Vakhsh River, countryHydropowerImportance, one of the main hydropower rivers of Tajikistan]
  • A. hydropowerImportance chosen
    Indicates the degree to which hydropower is considered significant or valuable within a given context, such as an energy system, region, or policy framework.
  • B. hydropowerPotential
    Indicates the amount of energy that could be generated from water resources at a given site or region under specified conditions.
  • C. hasHydroelectricDevelopments
    Indicates that one entity possesses, contains, or is associated with hydroelectric power generation installations or projects.
  • D. hasHydroelectricProject
    Indicates that an entity is associated with, operates, or contains a hydroelectric power generation project.
  • E. numberOfHydroelectricStations
    Indicates the quantity of hydroelectric power stations associated with a given entity.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c688058d6881908c19b309cc55dbfa completed March 27, 2026, 1:37 p.m.
NER Named-entity recognition batch_69c6c1b15d3481908ae66e3d7564b352 completed March 27, 2026, 5:43 p.m.
PD Predicate disambiguation batch_69c6acf6d4148190914b19e9affd8c76 completed March 27, 2026, 4:14 p.m.
Created at: March 27, 2026, 1:51 p.m.