Triple
T6546654
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Cowes Floating Bridge |
E151025
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | pedestrian ferry |
C4627
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: pedestrian ferry Context triple: [Cowes Floating Bridge, instanceOf, pedestrian ferry]
-
A.
pedestrian bridge
A pedestrian bridge is a raised structure designed exclusively for people on foot (and often cyclists) to safely cross obstacles such as roads, railways, or waterways without interacting with vehicular traffic.
-
B.
passenger ferry
chosen
A passenger ferry is a vessel designed to transport people, and sometimes light vehicles or cargo, across bodies of water on regular, short-distance routes.
-
C.
cable ferry
A cable ferry is a watercraft that transports passengers, vehicles, or goods across a body of water by being guided and often propelled along fixed cables anchored on either shore.
-
D.
river ferry dock
A river ferry dock is a designated waterfront structure where ferries safely load, unload, and temporarily moor while transporting passengers, vehicles, or goods across a river.
-
E.
pedestrian skybridge
A pedestrian skybridge is an elevated, enclosed or open walkway that connects two or more buildings above ground level, allowing people to cross safely and conveniently without interacting with street traffic.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c687f3fd60819083bfa583e5bcfa71 |
completed | March 27, 2026, 1:36 p.m. |
Created at: March 27, 2026, 1:50 p.m.