Triple

T6535760
Position Surface form Disambiguated ID Type / Status
Subject Asian Project Market E152358 entity
Predicate instanceOf P0 FINISHED
Object co-production platform C10752 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: co-production platform
Context triple: [Asian Project Market, instanceOf, co-production platform]
  • A. convening platform chosen
    A convening platform is a structured environment—physical, digital, or hybrid—that brings diverse stakeholders together to connect, collaborate, and coordinate around shared goals or issues.
  • B. Supply-side platform
    A supply-side platform is a technology system that helps digital publishers manage, optimize, and automate the selling of their advertising inventory across multiple ad exchanges and demand sources.
  • C. collaborative online platform
    A collaborative online platform is a digital environment that enables multiple users to work together in real time or asynchronously by sharing information, coordinating tasks, and communicating through integrated tools and services.
  • D. viewing platform
    A viewing platform is an elevated, often open structure designed to provide people with a safe, unobstructed vantage point for observing the surrounding environment or specific points of interest.
  • E. collaborative project
    A collaborative project is a coordinated effort in which multiple individuals or groups work together, sharing responsibilities, resources, and expertise to achieve a common goal.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c688048ec8819093a47f7d332e12ec completed March 27, 2026, 1:37 p.m.
Created at: March 27, 2026, 1:46 p.m.