Triple

T653093
Position Surface form Disambiguated ID Type / Status
Subject Four Year Plan decree of 1936 E11386 entity
Predicate instanceOf P0 FINISHED
Object Nazi economic policy C1637 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Nazi economic policy
Context triple: [Four Year Plan decree of 1936, instanceOf, Nazi economic policy]
  • A. Soviet economic policy
    Soviet economic policy refers to the centrally planned, state-controlled system that directed production, distribution, and investment according to government-determined goals rather than market forces, aiming to rapidly industrialize and achieve socialist objectives.
  • B. war economy
    A war economy is an economic system in which a nation’s resources, production, and policies are heavily directed toward supporting military conflict, often involving central planning, rationing, and reallocation of labor and capital from civilian to defense needs.
  • C. economic policy chosen
    Economic policy is a set of government decisions and actions designed to influence a nation's economic performance, including growth, employment, inflation, and income distribution.
  • D. Napoleonic policy
    Napoleonic policy refers to the strategic, administrative, legal, and military measures implemented by Napoleon Bonaparte to centralize authority, modernize state institutions, expand French influence, and consolidate his personal rule across Europe.
  • E. Nazi Germany expansion
    Nazi Germany expansion refers to the aggressive territorial and political enlargement of Germany under Adolf Hitler from 1938 to 1941 through annexations, invasions, and occupations that precipitated and escalated World War II in Europe.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a493266a2881909daf4c40f719dee8 completed March 1, 2026, 7:27 p.m.
Created at: March 1, 2026, 7:36 p.m.