Triple
T6527675
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Joint Congressional Committee on Inaugural Ceremonies |
E151346
|
entity |
| Predicate | worksWith |
P398
|
FINISHED |
| Object |
Presidential Inaugural Committee
The Presidential Inaugural Committee is the organization formed by the incoming U.S. president to plan and oversee inaugural celebrations, events, and related activities surrounding the presidential swearing-in.
|
E606118
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Presidential Inaugural Committee | Statement: [Joint Congressional Committee on Inaugural Ceremonies, worksWith, Presidential Inaugural Committee]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Presidential Inaugural Committee Context triple: [Joint Congressional Committee on Inaugural Ceremonies, worksWith, Presidential Inaugural Committee]
-
A.
Joint Congressional Committee on Inaugural Ceremonies
The Joint Congressional Committee on Inaugural Ceremonies is a bipartisan committee of the U.S. Congress responsible for planning and overseeing the formal swearing-in ceremonies for incoming presidents and vice presidents.
-
B.
Presidential Inaugural Committee 2005
The Presidential Inaugural Committee 2005 was the official body responsible for planning and overseeing the ceremonies and events surrounding George W. Bush’s second-term presidential inauguration.
-
C.
2013 Presidential Inaugural Committee
The 2013 Presidential Inaugural Committee was the official organization responsible for planning and overseeing the ceremonial and celebratory events surrounding Barack Obama’s second-term inauguration.
-
D.
Presidents Committee
The Presidents Committee is a high-level governing body within the International Organization of Securities Commissions (IOSCO) that brings together the heads of member securities regulators to guide the organization’s strategic direction.
-
E.
Presidents’ Conference Committee
The Presidents’ Conference Committee was a group of U.S. electric railway executives that collaboratively developed standardized, modern streetcar designs in the early 20th century to improve urban transit systems.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Presidential Inaugural Committee Triple: [Joint Congressional Committee on Inaugural Ceremonies, worksWith, Presidential Inaugural Committee]
Generated description
The Presidential Inaugural Committee is the organization formed by the incoming U.S. president to plan and oversee inaugural celebrations, events, and related activities surrounding the presidential swearing-in.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Presidential Inaugural Committee Target entity description: The Presidential Inaugural Committee is the organization formed by the incoming U.S. president to plan and oversee inaugural celebrations, events, and related activities surrounding the presidential swearing-in.
-
A.
Joint Congressional Committee on Inaugural Ceremonies
The Joint Congressional Committee on Inaugural Ceremonies is a bipartisan committee of the U.S. Congress responsible for planning and overseeing the formal swearing-in ceremonies for incoming presidents and vice presidents.
-
B.
Presidential Inaugural Committee 2005
chosen
The Presidential Inaugural Committee 2005 was the official body responsible for planning and overseeing the ceremonies and events surrounding George W. Bush’s second-term presidential inauguration.
-
C.
2013 Presidential Inaugural Committee
The 2013 Presidential Inaugural Committee was the official organization responsible for planning and overseeing the ceremonial and celebratory events surrounding Barack Obama’s second-term inauguration.
-
D.
Presidents Committee
The Presidents Committee is a high-level governing body within the International Organization of Securities Commissions (IOSCO) that brings together the heads of member securities regulators to guide the organization’s strategic direction.
-
E.
Presidents’ Conference Committee
The Presidents’ Conference Committee was a group of U.S. electric railway executives that collaboratively developed standardized, modern streetcar designs in the early 20th century to improve urban transit systems.
- F. None of above.
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c687f522748190b3058405553cdabd |
completed | March 27, 2026, 1:36 p.m. |
| NER | Named-entity recognition | batch_69c6ada9c8408190b1bc327985366be9 |
completed | March 27, 2026, 4:17 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69c6e416e884819099c788cc3a814414 |
completed | March 27, 2026, 8:09 p.m. |
| NEDg | Description generation | batch_69c6e55028ac8190b2bde6637981195c |
completed | March 27, 2026, 8:15 p.m. |
| NED2 | Entity disambiguation (via description) | batch_69c6e5eacefc819092d0e9f79d90c4a6 |
completed | March 27, 2026, 8:17 p.m. |
Created at: March 27, 2026, 1:45 p.m.