Triple

T6527558
Position Surface form Disambiguated ID Type / Status
Subject 2005 U.S. presidential inauguration of George W. Bush E151343 entity
Predicate organizer P123 FINISHED
Object Presidential Inaugural Committee 2005
The Presidential Inaugural Committee 2005 was the official body responsible for planning and overseeing the ceremonies and events surrounding George W. Bush’s second-term presidential inauguration.
E606118 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Presidential Inaugural Committee 2005 | Statement: [2005 U.S. presidential inauguration of George W. Bush, organizer, Presidential Inaugural Committee 2005]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Presidential Inaugural Committee 2005
Context triple: [2005 U.S. presidential inauguration of George W. Bush, organizer, Presidential Inaugural Committee 2005]
  • A. 2013 Presidential Inaugural Committee
    The 2013 Presidential Inaugural Committee was the official organization responsible for planning and overseeing the ceremonial and celebratory events surrounding Barack Obama’s second-term inauguration.
  • B. Joint Congressional Committee on Inaugural Ceremonies
    The Joint Congressional Committee on Inaugural Ceremonies is a bipartisan committee of the U.S. Congress responsible for planning and overseeing the formal swearing-in ceremonies for incoming presidents and vice presidents.
  • C. Committee to Re-elect the President
    The Committee to Re-elect the President was U.S. President Richard Nixon’s 1972 campaign organization, best known for its central role in financing and orchestrating activities that led to the Watergate scandal.
  • D. Presidents’ Conference Committee
    The Presidents’ Conference Committee was a group of U.S. electric railway executives that collaboratively developed standardized, modern streetcar designs in the early 20th century to improve urban transit systems.
  • E. Commission on Presidential Debates
    The Commission on Presidential Debates is a nonpartisan nonprofit organization that sponsors and organizes general-election presidential and vice-presidential debates in the United States.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Presidential Inaugural Committee 2005
Triple: [2005 U.S. presidential inauguration of George W. Bush, organizer, Presidential Inaugural Committee 2005]
Generated description
The Presidential Inaugural Committee 2005 was the official body responsible for planning and overseeing the ceremonies and events surrounding George W. Bush’s second-term presidential inauguration.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Presidential Inaugural Committee 2005
Target entity description: The Presidential Inaugural Committee 2005 was the official body responsible for planning and overseeing the ceremonies and events surrounding George W. Bush’s second-term presidential inauguration.
  • A. 2013 Presidential Inaugural Committee
    The 2013 Presidential Inaugural Committee was the official organization responsible for planning and overseeing the ceremonial and celebratory events surrounding Barack Obama’s second-term inauguration.
  • B. Joint Congressional Committee on Inaugural Ceremonies
    The Joint Congressional Committee on Inaugural Ceremonies is a bipartisan committee of the U.S. Congress responsible for planning and overseeing the formal swearing-in ceremonies for incoming presidents and vice presidents.
  • C. Committee to Re-elect the President
    The Committee to Re-elect the President was U.S. President Richard Nixon’s 1972 campaign organization, best known for its central role in financing and orchestrating activities that led to the Watergate scandal.
  • D. Presidents’ Conference Committee
    The Presidents’ Conference Committee was a group of U.S. electric railway executives that collaboratively developed standardized, modern streetcar designs in the early 20th century to improve urban transit systems.
  • E. Commission on Presidential Debates
    The Commission on Presidential Debates is a nonpartisan nonprofit organization that sponsors and organizes general-election presidential and vice-presidential debates in the United States.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c687f522748190b3058405553cdabd completed March 27, 2026, 1:36 p.m.
NER Named-entity recognition batch_69c6ada9c8408190b1bc327985366be9 completed March 27, 2026, 4:17 p.m.
NED1 Entity disambiguation (via context triple) batch_69c6d52a642c8190a50988f3faf61d39 completed March 27, 2026, 7:06 p.m.
NEDg Description generation batch_69c6d6745b40819083fbcb2a4063e34d completed March 27, 2026, 7:11 p.m.
NED2 Entity disambiguation (via description) batch_69c6d830ed6c8190a39126d97a5246d3 completed March 27, 2026, 7:19 p.m.
Created at: March 27, 2026, 1:45 p.m.