Triple

T6524429
Position Surface form Disambiguated ID Type / Status
Subject Transitway E151266 entity
Predicate instanceOf P0 FINISHED
Object grade-separated busway network C4130 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: grade-separated busway network
Context triple: [Transitway, instanceOf, grade-separated busway network]
  • A. road network
    A road network is an interconnected system of roads, intersections, and related infrastructure that enables the movement of vehicles and pedestrians between different locations.
  • B. transport infrastructure network chosen
    A transport infrastructure network is an interconnected system of physical routes and facilities—such as roads, railways, ports, and airports—designed to enable the efficient movement of people and goods across regions.
  • C. highway system
    A highway system is an interconnected network of major roads and supporting infrastructure designed to enable efficient, high-capacity vehicular travel between cities and regions.
  • D. road infrastructure
    Road infrastructure encompasses the physical structures, systems, and facilities—such as roads, bridges, tunnels, signage, and drainage—designed and built to support safe and efficient vehicular and pedestrian transportation.
  • E. road transportation corridor
    A road transportation corridor is a designated linear area of land that accommodates one or more roadways and associated infrastructure to enable the efficient movement of vehicles, goods, and people between key origins and destinations.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c687f522748190b3058405553cdabd completed March 27, 2026, 1:36 p.m.
Created at: March 27, 2026, 1:45 p.m.