Triple

T6516328
Position Surface form Disambiguated ID Type / Status
Subject Joint Operation Planning and Execution System E148272 entity
Predicate instanceOf P0 FINISHED
Object military planning system C11609 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: military planning system
Context triple: [Joint Operation Planning and Execution System, instanceOf, military planning system]
  • A. military planning document
    A military planning document is a formal written plan that outlines objectives, strategies, resources, timelines, and contingencies for conducting military operations or activities.
  • B. military system chosen
    A military system is an organized structure of personnel, equipment, doctrines, and processes designed to plan, conduct, and support defense and combat operations.
  • C. military program
    A military program is an organized set of defense-related activities, projects, or initiatives designed to develop, maintain, or enhance a nation's armed forces capabilities and readiness.
  • D. military strategy
    Military strategy is the high-level planning and directing of armed forces and resources to achieve political and military objectives in war or conflict.
  • E. military project
    A military project is a coordinated, goal-driven initiative undertaken by armed forces or defense organizations to develop, test, or deploy capabilities, technologies, or operations that enhance national security and military effectiveness.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c687e68e748190baceb9298f32d3ed completed March 27, 2026, 1:36 p.m.
Created at: March 27, 2026, 1:44 p.m.