Triple
T6501705
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Ledra Street crossing point |
E148903
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | pedestrian crossing |
C6047
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: pedestrian crossing Context triple: [Ledra Street crossing point, instanceOf, pedestrian crossing]
-
A.
pedestrian bridge
A pedestrian bridge is a raised structure designed exclusively for people on foot (and often cyclists) to safely cross obstacles such as roads, railways, or waterways without interacting with vehicular traffic.
-
B.
pedestrian walkway
chosen
A pedestrian walkway is a designated path or corridor intended exclusively or primarily for people traveling on foot, providing safe and convenient passage separated from vehicular traffic.
-
C.
pedestrian skybridge
A pedestrian skybridge is an elevated, enclosed or open walkway that connects two or more buildings above ground level, allowing people to cross safely and conveniently without interacting with street traffic.
-
D.
pedestrian network
A pedestrian network is an interconnected system of walkways, sidewalks, crossings, and paths designed to facilitate safe and efficient movement of people on foot within and between areas.
-
E.
road junction
A road junction is a point where two or more roads meet or cross, allowing vehicles and pedestrians to change direction or route.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c687e9ad288190bae5bcac9c8ac855 |
completed | March 27, 2026, 1:36 p.m. |
Created at: March 27, 2026, 1:42 p.m.