Triple

T6485426
Position Surface form Disambiguated ID Type / Status
Subject River Tummel E146495 entity
Predicate managedBy P86 FINISHED
Object SSE Renewables E510360 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: SSE Renewables | Statement: [River Tummel, managedBy, SSE Renewables]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: SSE Renewables
Context triple: [River Tummel, managedBy, SSE Renewables]
  • A. SSE Renewables chosen
    SSE Renewables is a UK-based renewable energy company focused on developing, owning, and operating wind and hydroelectric power assets, particularly offshore wind farms.
  • B. EDF Renewables
    EDF Renewables is a global renewable energy company specializing in the development, construction, and operation of wind, solar, and energy storage projects.
  • C. Ørsted
    Ørsted is a Danish renewable energy company and one of the world’s leading developers and operators of offshore wind farms.
  • D. Npower Renewables
    Npower Renewables is a UK-based renewable energy company specializing in the development and operation of wind power projects, including offshore wind farms.
  • E. Helion Energy
    Helion Energy is a private American nuclear fusion company focused on developing commercial fusion power technology as a clean, scalable energy source.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c0090158c08190af0df9a2348d2d52 completed March 22, 2026, 3:21 p.m.
NER Named-entity recognition batch_69c06a6efe1881909a044b1cdaa511af completed March 22, 2026, 10:17 p.m.
NED1 Entity disambiguation (via context triple) batch_69c653b4e91c81908dfa1798a057b21a completed March 27, 2026, 9:53 a.m.
Created at: March 22, 2026, 4:52 p.m.