Triple

T6457570
Position Surface form Disambiguated ID Type / Status
Subject Renfe Operadora E142030 entity
Predicate brand P1500 FINISHED
Object Alvia E535883 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Alvia | Statement: [Renfe Operadora, brand, Alvia]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Alvia
Context triple: [Renfe Operadora, brand, Alvia]
  • A. Aventra
    Aventra is a family of modern electric multiple-unit trains designed and built by Bombardier Transportation (now Alstom) for use on the UK rail network.
  • B. Voyager trains
    Voyager trains are a family of high-speed diesel-electric multiple unit passenger trains widely used on intercity services in the UK rail network.
  • C. Talgo 350
    The Talgo 350 is a high-speed electric train developed by Spanish manufacturer Talgo, designed for very fast intercity services and widely used on premium high-speed rail lines.
  • D. Arriva
    Arriva is a major European public transport company that operates bus, coach, train, tram, and waterbus services across multiple countries.
  • E. Renfe Alvia chosen
    Renfe Alvia is a Spanish long-distance high-speed train service operated by Renfe that combines standard and variable-gauge rolling stock to connect major cities across both high-speed and conventional rail lines.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c008d2f91c8190a8178767a35e08fc completed March 22, 2026, 3:20 p.m.
NER Named-entity recognition batch_69c069d758508190b9c7358ef84f8169 completed March 22, 2026, 10:14 p.m.
NED1 Entity disambiguation (via context triple) batch_69c64bdef4a881908f3d7b6eefab7def completed March 27, 2026, 9:20 a.m.
Created at: March 22, 2026, 4:48 p.m.