Triple
T6413504
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Dipylon Gate to Acropolis |
E127766
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | ceremonial route |
C6715
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: ceremonial route Context triple: [Dipylon Gate to Acropolis, instanceOf, ceremonial route]
-
A.
ceremonial road
chosen
A ceremonial road is a specially designated route used for formal processions, rituals, or state occasions, often designed to emphasize symbolic, cultural, or political significance.
-
B.
ceremonial corridor
A ceremonial corridor is a formal, often architecturally embellished passageway designed to frame and elevate processions, rituals, or symbolic movement through a space.
-
C.
ceremonial precinct
A ceremonial precinct is a designated, often architecturally distinct area within a settlement or sacred landscape reserved for ritual, religious, or state ceremonial activities.
-
D.
ceremonial system
A ceremonial system is an organized framework of rituals, symbols, roles, and procedures that structure and regulate formal events or sacred practices within a culture or institution.
-
E.
ceremonial event
A ceremonial event is a formally organized occasion marked by prescribed rituals, symbols, and actions that express and reinforce cultural, social, or institutional meanings.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c0083723d88190b1e37b19df162c08 |
completed | March 22, 2026, 3:18 p.m. |
Created at: March 22, 2026, 4:42 p.m.