Triple

T6410588
Position Surface form Disambiguated ID Type / Status
Subject Eigg Electric E127694 entity
Predicate instanceOf P0 FINISHED
Object microgrid C7916 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: microgrid
Context triple: [Eigg Electric, instanceOf, microgrid]
  • A. grid-scale battery energy storage system
    A grid-scale battery energy storage system is a large, utility-level installation that stores electrical energy in batteries to balance supply and demand, enhance grid stability, and support the integration of variable renewable energy sources.
  • B. power system chosen
    A power system is an interconnected network of generation, transmission, distribution, and control components designed to produce and deliver electrical energy reliably and efficiently to end users.
  • C. energy hub
    An energy hub is a centralized system or facility that integrates, converts, stores, and distributes multiple forms of energy (such as electricity, heat, and fuels) to optimize efficiency, reliability, and sustainability across connected users and infrastructures.
  • D. energy storage system
    An energy storage system is a device or group of devices that capture, store, and release energy for later use to improve reliability, efficiency, and flexibility of power supply.
  • E. battery energy storage system
    A battery energy storage system is an integrated solution that stores electrical energy in batteries for later use, enabling load shifting, backup power, and grid support functions.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c0083723d88190b1e37b19df162c08 completed March 22, 2026, 3:18 p.m.
Created at: March 22, 2026, 4:41 p.m.