Triple

T6401035
Position Surface form Disambiguated ID Type / Status
Subject Port of Qingdao E144062 entity
Predicate instanceOf P0 FINISHED
Object bulk cargo port C452 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: bulk cargo port
Context triple: [Port of Qingdao, instanceOf, bulk cargo port]
  • A. maritime warehouse
    A maritime warehouse is a specialized storage facility located at or near a port, designed to handle, protect, and manage goods transported by sea, including loading, unloading, and temporary holding of cargo.
  • B. inland port
    An inland port is a logistics and transportation hub located away from coastal seaports, typically along rivers, canals, or rail corridors, that facilitates the transfer, storage, and distribution of goods between different modes of transport.
  • C. seaport chosen
    A seaport is a coastal facility equipped with harbors, docks, and infrastructure to enable the loading, unloading, storage, and transfer of cargo and passengers between sea and land transportation.
  • D. port crane
    A port crane is a large, fixed or mobile lifting machine used at harbors and container terminals to load, unload, and move cargo between ships and the shore.
  • E. former port facility
    A former port facility is a decommissioned maritime infrastructure area that once supported cargo or passenger shipping operations but is no longer used for its original port functions.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c008dc56fc81908d43ffcc11d73bdd completed March 22, 2026, 3:21 p.m.
Created at: March 22, 2026, 4:35 p.m.