Triple

T6395565
Position Surface form Disambiguated ID Type / Status
Subject C-3 E143931 entity
Predicate usesRailwayCorridor P15040 FINISHED
Object Madrid–Aranjuez railway
The Madrid–Aranjuez railway is one of Spain’s oldest railway lines, historically linking Madrid with the royal town of Aranjuez and playing a key role in the early development of the country’s rail network.
E590188 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Madrid–Aranjuez railway | Statement: [C-3, usesRailwayCorridor, Madrid–Aranjuez railway]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Madrid–Aranjuez railway
Context triple: [C-3, usesRailwayCorridor, Madrid–Aranjuez railway]
  • A. Madrid–Andalusia railway
    The Madrid–Andalusia railway is a major rail line in Spain that connects the capital, Madrid, with the southern region of Andalusia, serving as a key corridor for both passenger and freight transport.
  • B. Madrid–Valencia railway
    The Madrid–Valencia railway is a major Spanish rail line connecting the nation’s capital with the Mediterranean port city of Valencia, serving as an important corridor for both passenger and freight transport.
  • C. Madrid–Barcelona railway
    The Madrid–Barcelona railway is a major Spanish rail line linking the capital Madrid with the northeastern city of Barcelona, serving as one of the country’s principal passenger and freight corridors.
  • D. Madrid–Alicante railway
    The Madrid–Alicante railway is a major Spanish rail line connecting the capital Madrid with the Mediterranean coastal city of Alicante, serving as an important corridor for both passenger and freight transport.
  • E. Valença–Tui rail link
    The Valença–Tui rail link is an international railway connection between Portugal and Spain, crossing the Minho River between the towns of Valença and Tui.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Madrid–Aranjuez railway
Triple: [C-3, usesRailwayCorridor, Madrid–Aranjuez railway]
Generated description
The Madrid–Aranjuez railway is one of Spain’s oldest railway lines, historically linking Madrid with the royal town of Aranjuez and playing a key role in the early development of the country’s rail network.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Madrid–Aranjuez railway
Target entity description: The Madrid–Aranjuez railway is one of Spain’s oldest railway lines, historically linking Madrid with the royal town of Aranjuez and playing a key role in the early development of the country’s rail network.
  • A. Madrid–Andalusia railway
    The Madrid–Andalusia railway is a major rail line in Spain that connects the capital, Madrid, with the southern region of Andalusia, serving as a key corridor for both passenger and freight transport.
  • B. Madrid–Valencia railway
    The Madrid–Valencia railway is a major Spanish rail line connecting the nation’s capital with the Mediterranean port city of Valencia, serving as an important corridor for both passenger and freight transport.
  • C. Madrid–Barcelona railway
    The Madrid–Barcelona railway is a major Spanish rail line linking the capital Madrid with the northeastern city of Barcelona, serving as one of the country’s principal passenger and freight corridors.
  • D. Madrid–Alicante railway
    The Madrid–Alicante railway is a major Spanish rail line connecting the capital Madrid with the Mediterranean coastal city of Alicante, serving as an important corridor for both passenger and freight transport.
  • E. Valença–Tui rail link
    The Valença–Tui rail link is an international railway connection between Portugal and Spain, crossing the Minho River between the towns of Valença and Tui.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c008db906c819096f3597d55d95432 completed March 22, 2026, 3:20 p.m.
NER Named-entity recognition batch_69c0688275d0819086b58123c743a6db completed March 22, 2026, 10:09 p.m.
NED1 Entity disambiguation (via context triple) batch_69c63897a5408190b6aada0e5c67fe27 completed March 27, 2026, 7:58 a.m.
NEDg Description generation batch_69c63a780e948190b61e42d31f2276ac completed March 27, 2026, 8:06 a.m.
NED2 Entity disambiguation (via description) batch_69c63b1c559c8190b9ab541193df48bb completed March 27, 2026, 8:09 a.m.
Created at: March 22, 2026, 4:35 p.m.