Triple

T6372614
Position Surface form Disambiguated ID Type / Status
Subject Kemble E143386 entity
Predicate railLine P848 FINISHED
Object Golden Valley Line E181781 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Golden Valley Line | Statement: [Kemble, railLine, Golden Valley Line]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Golden Valley Line
Context triple: [Kemble, railLine, Golden Valley Line]
  • A. Golden Valley Line chosen
    The Golden Valley Line is a regional railway route in England running through the scenic Golden Valley between Gloucester and Swindon, serving towns such as Stroud and Kemble.
  • B. Valley Line
    The Valley Line is a light rail transit route in Edmonton, Alberta, designed as a low-floor, urban-style line connecting southeastern and western parts of the city.
  • C. Blue Line
    The Blue Line is one of Boston's MBTA rapid transit routes, running primarily between downtown Boston and the coastal communities of East Boston and Revere.
  • D. Blue Line
    The Blue Line is a light rail route in the Dallas Area Rapid Transit (DART) system serving key neighborhoods and suburbs in the Dallas–Fort Worth metroplex.
  • E. Blue Line
    The Blue Line is a planned rapid transit corridor of Bengaluru’s Namma Metro network intended to expand connectivity across additional parts of the city.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c008d9f4348190ab598a2913259a1c completed March 22, 2026, 3:20 p.m.
NER Named-entity recognition batch_69c06829d76c819092b476631459233a completed March 22, 2026, 10:07 p.m.
NED1 Entity disambiguation (via context triple) batch_69c65383e7148190817bd25840212cc6 completed March 27, 2026, 9:53 a.m.
Created at: March 22, 2026, 4:33 p.m.