Triple
T6350934
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | End TB Strategy |
E142867
|
entity |
| Predicate | interimTargetYear |
P26643
|
FINISHED |
| Object | 2020 |
—
|
LITERAL FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 2020 | Statement: [End TB Strategy, interimTargetYear, 2020]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: interimTargetYear Context triple: [End TB Strategy, interimTargetYear, 2020]
-
A.
transitionYear
Indicates the specific year in which a change, shift, or transition from one state, condition, or phase to another occurs.
-
B.
planningYear
Indicates the year in which planning or preparation activities for something are scheduled or designated to occur.
-
C.
endYear
Indicates the year in which an event, state, or relationship comes to an end.
-
D.
missionYear
Indicates the specific calendar year in which a mission takes place, is launched, or is officially designated.
-
E.
hasGoalYear
chosen
Indicates that an entity is associated with a specific target year by which a goal or objective is intended to be achieved.
- F. None of above.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c008d6dcbc8190aa1c2f1fd8916b42 |
completed | March 22, 2026, 3:20 p.m. |
| NER | Named-entity recognition | batch_69c067dc2790819084aaf7067dc25733 |
completed | March 22, 2026, 10:06 p.m. |
| PD | Predicate disambiguation | batch_69c060ec091c8190912aac44e1b8b1c9 |
completed | March 22, 2026, 9:36 p.m. |
Created at: March 22, 2026, 4:31 p.m.