Triple

T6335799
Position Surface form Disambiguated ID Type / Status
Subject S41 E142487 entity
Predicate instanceOf P0 FINISHED
Object circular railway line C6366 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: circular railway line
Context triple: [S41, instanceOf, circular railway line]
  • A. urban rail loop line chosen
    An urban rail loop line is a circular or near-circular transit route within a city that connects multiple districts and intersecting lines, allowing continuous, bidirectional travel without a terminal endpoint.
  • B. railway line
    A railway line is a fixed transportation route consisting of tracks, signaling, and related infrastructure along which trains operate between defined locations.
  • C. public railway
    A public railway is a government- or publicly-owned rail transport system that provides scheduled passenger and/or freight services accessible to the general population, typically operating on standardized tracks and infrastructure.
  • D. commuter rail line
    A commuter rail line is a passenger train service that operates on fixed tracks and schedules to connect suburban or outlying areas with a central city, primarily serving daily work and school commuters.
  • E. monorail line
    A monorail line is a guided transit route where trains run on a single rail or beam, typically elevated, providing efficient and often automated urban or interurban transportation.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c008d4d8e88190ad301c05b08722ac completed March 22, 2026, 3:20 p.m.
Created at: March 22, 2026, 4:30 p.m.