Triple
T6311023
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | T6 beam line |
E141500
|
entity |
| Predicate | deliversTo |
P31954
|
FINISHED |
| Object | North Area experimental facilities |
E99649
|
NE FINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: North Area experimental facilities | Statement: [T6 beam line, deliversTo, North Area experimental facilities]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: North Area experimental facilities Context triple: [T6 beam line, deliversTo, North Area experimental facilities]
-
A.
North Area experimental zones
chosen
The North Area experimental zones are a collection of experimental facilities at CERN where high-energy particle beams are delivered to multiple fixed-target experiments for research in particle and nuclear physics.
-
B.
East Area experimental zones
The East Area experimental zones are dedicated research facilities at CERN where particle beams from the Proton Synchrotron are used for a variety of physics experiments and detector tests.
-
C.
Experimental Area 1
Experimental Area 1 is a dedicated experimental zone at CERN’s n_TOF neutron time-of-flight facility used for high-precision neutron-induced reaction measurements.
-
D.
Experimental Area 2
Experimental Area 2 is a dedicated measurement station at CERN’s n_TOF neutron time-of-flight facility used for high-precision neutron-induced reaction experiments.
-
E.
Oak Ridge Reservation
Oak Ridge Reservation is a large U.S. Department of Energy site in Oak Ridge, Tennessee, historically central to the Manhattan Project and now a major center for nuclear research, environmental management, and national security work.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: deliversTo Context triple: [T6 beam line, deliversTo, North Area experimental facilities]
-
A.
offersDeliveryTo
Indicates that one entity provides delivery services to another entity or location.
-
B.
delivers
chosen
Indicates that one entity transports or hands over something to another entity as intended or required.
-
C.
deliveredFrom
Indicates that something has been sent, transported, or provided from a particular source or origin to another party or location.
-
D.
deliveredBy
Indicates that something (such as a product, message, or service) is brought, transported, or provided to its destination by a specified agent or carrier.
-
E.
deliverySystem
Indicates a system, method, or mechanism by which something (such as a product, service, or substance) is transported, distributed, or conveyed from a source to a recipient.
- F. None of above.
Provenance (4 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c008d00efc8190a36c05b4b4a3bf4b |
completed | March 22, 2026, 3:20 p.m. |
| NER | Named-entity recognition | batch_69c0649d1e048190a3fc7fbce9d2ee57 |
completed | March 22, 2026, 9:52 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69c5e461e2ec8190af7198a03edb1ff7 |
completed | March 27, 2026, 1:58 a.m. |
| PD | Predicate disambiguation | batch_69c060e311b48190b1c74a5cf9435623 |
completed | March 22, 2026, 9:36 p.m. |
Created at: March 22, 2026, 4:28 p.m.