Triple
T6308679
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Nevada State Route 88 |
E141442
|
entity |
| Predicate | abbreviation |
P43
|
FINISHED |
| Object | SR 88 |
E423357
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: SR 88 | Statement: [Nevada State Route 88, abbreviation, SR 88]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: SR 88 Context triple: [Nevada State Route 88, abbreviation, SR 88]
-
A.
SR 88
chosen
SR 88 is a scenic California state highway that traverses the Sierra Nevada, connecting the Central Valley to mountain communities and recreational areas near the Nevada border.
-
B.
SR 89
SR 89 is a scenic north–south state highway in California that traverses the Sierra Nevada and Cascade Range, connecting several mountain communities, lakes, and recreational areas.
-
C.
SR 87
SR 87 is a north–south state highway in Florida that connects coastal communities near Navarre with inland areas of Santa Rosa County.
-
D.
SR 81
SR 81 is a state highway in Georgia that connects several communities in the eastern and north-central part of the state.
-
E.
SR 286
SR 286 is a major north–south arterial highway in Fairfax County, Virginia, commonly known as the Fairfax County Parkway.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c008d00efc8190a36c05b4b4a3bf4b |
completed | March 22, 2026, 3:20 p.m. |
| NER | Named-entity recognition | batch_69c0647f13a4819095c4ce8c42c5d1fb |
completed | March 22, 2026, 9:51 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69c5e45330ec8190945682962ae823b0 |
completed | March 27, 2026, 1:58 a.m. |
Created at: March 22, 2026, 4:28 p.m.