Triple
T6282298
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Lie ring |
E140808
|
entity |
| Predicate | bracketIsBiadditive |
P4232
|
FINISHED |
| Object | true |
—
|
LITERAL FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: true | Statement: [Lie ring, bracketIsBiadditive, true]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: bracketIsBiadditive Context triple: [Lie ring, bracketIsBiadditive, true]
-
A.
isAdditiveFor
chosen
Indicates that one entity can be combined with another in a way that their effects or quantities sum together to produce a cumulative result.
-
B.
isCommutative
Indicates that the result of applying an operation to two entities does not depend on their order (i.e., a ∘ b = b ∘ a).
-
C.
isAssociative
Indicates that the grouping of operands does not affect the result of the operation (i.e., (a * b) * c = a * (b * c)).
-
D.
isNonAbelian
Indicates that the operation or structure in question does not satisfy commutativity, so the order of applying the operation matters.
-
E.
hasCommutationRelations
Indicates that there exist specific commutation relations governing how two operators or elements combine or reorder with respect to each other.
- F. None of above.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c008cd17c8819082b82d3fbeb68047 |
completed | March 22, 2026, 3:20 p.m. |
| NER | Named-entity recognition | batch_69c063f956c08190ae0f198ccbd68b42 |
completed | March 22, 2026, 9:49 p.m. |
| PD | Predicate disambiguation | batch_69c05608a5608190b22a1fdc4060470d |
completed | March 22, 2026, 8:50 p.m. |
Created at: March 22, 2026, 4:26 p.m.