Triple

T6281313
Position Surface form Disambiguated ID Type / Status
Subject Iberia’s Latin American network E140787 entity
Predicate instanceOf P0 FINISHED
Object long-haul route network C2519 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: long-haul route network
Context triple: [Iberia’s Latin American network, instanceOf, long-haul route network]
  • A. long-haul airline
    A long-haul airline is an air carrier that operates extended-duration international or transcontinental flights, typically over six hours, using wide-body aircraft designed for long-range travel and passenger comfort.
  • B. transportation route chosen
    A transportation route is a defined path or corridor used to move people or goods between locations via one or more modes of transport.
  • C. long-distance cycle route
    A long-distance cycle route is a designated, often waymarked cycling corridor that spans substantial distances, connecting regions or countries and providing cyclists with a continuous, safe, and scenic path for multi-day journeys.
  • D. long-range airliner
    A long-range airliner is a large, fuel-efficient passenger aircraft designed to fly non-stop over intercontinental distances while providing reliable comfort and services.
  • E. transport infrastructure network
    A transport infrastructure network is an interconnected system of physical routes and facilities—such as roads, railways, ports, and airports—designed to enable the efficient movement of people and goods across regions.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c008cd17c8819082b82d3fbeb68047 completed March 22, 2026, 3:20 p.m.
Created at: March 22, 2026, 4:26 p.m.