Triple
T6281312
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Iberia’s Latin American network |
E140787
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | airline route network |
C2519
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: airline route network Context triple: [Iberia’s Latin American network, instanceOf, airline route network]
-
A.
ferry service network
A ferry service network is a coordinated system of water-based transport routes, vessels, terminals, and schedules that moves passengers and cargo between multiple ports or coastal locations.
-
B.
transportation route
chosen
A transportation route is a defined path or corridor used to move people or goods between locations via one or more modes of transport.
-
C.
cargo airline
A cargo airline is an air transport company that operates aircraft primarily for the carriage of freight and mail rather than passengers.
-
D.
transport infrastructure network
A transport infrastructure network is an interconnected system of physical routes and facilities—such as roads, railways, ports, and airports—designed to enable the efficient movement of people and goods across regions.
-
E.
airports operator
An airports operator is an entity responsible for managing, maintaining, and coordinating the daily operations, infrastructure, services, and regulatory compliance of one or more airports.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c008cd17c8819082b82d3fbeb68047 |
completed | March 22, 2026, 3:20 p.m. |
Created at: March 22, 2026, 4:26 p.m.