Triple
T6259811
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Muskrat Falls Generating Station |
E140265
|
entity |
| Predicate | partOf |
P40
|
FINISHED |
| Object |
Atlantic Canada electricity system
The Atlantic Canada electricity system is the interconnected regional power network that supplies and transmits electricity across the eastern Canadian provinces, integrating major generation projects like Muskrat Falls.
|
E580301
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Atlantic Canada electricity system | Statement: [Muskrat Falls Generating Station, partOf, Atlantic Canada electricity system]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Atlantic Canada electricity system Context triple: [Muskrat Falls Generating Station, partOf, Atlantic Canada electricity system]
-
A.
Ontario electricity grid
The Ontario electricity grid is the province-wide interconnected network of power generation, transmission, and distribution infrastructure that delivers electricity to homes, businesses, and industries across Ontario, Canada.
-
B.
Newfoundland and Labrador Hydro
Newfoundland and Labrador Hydro is a provincial Crown-owned electric utility in Newfoundland and Labrador responsible for generating and transmitting electricity across the province.
-
C.
North American power transmission grid
The North American power transmission grid is the vast, interconnected high-voltage network that delivers electricity across the United States, Canada, and parts of Mexico through several major synchronized interconnections.
-
D.
Hydro-Québec
Hydro-Québec is a Canadian public utility company owned by the government of Quebec that generates, transmits, and distributes electricity, primarily from hydroelectric power.
-
E.
Manitoba Hydro
Manitoba Hydro is a provincial Crown corporation in Manitoba, Canada, responsible for generating, transmitting, and distributing electricity—primarily from large hydroelectric facilities—as well as providing natural gas services.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Atlantic Canada electricity system Triple: [Muskrat Falls Generating Station, partOf, Atlantic Canada electricity system]
Generated description
The Atlantic Canada electricity system is the interconnected regional power network that supplies and transmits electricity across the eastern Canadian provinces, integrating major generation projects like Muskrat Falls.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Atlantic Canada electricity system Target entity description: The Atlantic Canada electricity system is the interconnected regional power network that supplies and transmits electricity across the eastern Canadian provinces, integrating major generation projects like Muskrat Falls.
-
A.
Ontario electricity grid
The Ontario electricity grid is the province-wide interconnected network of power generation, transmission, and distribution infrastructure that delivers electricity to homes, businesses, and industries across Ontario, Canada.
-
B.
Newfoundland and Labrador Hydro
Newfoundland and Labrador Hydro is a provincial Crown-owned electric utility in Newfoundland and Labrador responsible for generating and transmitting electricity across the province.
-
C.
North American power transmission grid
The North American power transmission grid is the vast, interconnected high-voltage network that delivers electricity across the United States, Canada, and parts of Mexico through several major synchronized interconnections.
-
D.
Hydro-Québec
Hydro-Québec is a Canadian public utility company owned by the government of Quebec that generates, transmits, and distributes electricity, primarily from hydroelectric power.
-
E.
Manitoba Hydro
Manitoba Hydro is a provincial Crown corporation in Manitoba, Canada, responsible for generating, transmitting, and distributing electricity—primarily from large hydroelectric facilities—as well as providing natural gas services.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c008c95c5c819084bd3dd56133d84d |
completed | March 22, 2026, 3:20 p.m. |
| NER | Named-entity recognition | batch_69c06383616c819090c7994740317564 |
completed | March 22, 2026, 9:47 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69c24444b85c8190adf09c473b42ea9b |
completed | March 24, 2026, 7:59 a.m. |
| NEDg | Description generation | batch_69c4fb6bb9bc8190a29ae09221aa5464 |
completed | March 26, 2026, 9:24 a.m. |
| NED2 | Entity disambiguation (via description) | batch_69c4fc075dd881908230bb66d1445d5a |
completed | March 26, 2026, 9:27 a.m. |
Created at: March 22, 2026, 4:24 p.m.