Triple

T6255692
Position Surface form Disambiguated ID Type / Status
Subject Vermont/Beverly station E140157 entity
Predicate formerLineName P17520 FINISHED
Object Red Line E126838 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Red Line | Statement: [Vermont/Beverly station, formerLineName, Red Line]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Red Line
Context triple: [Vermont/Beverly station, formerLineName, Red Line]
  • A. Red Line
    The Red Line is a major rapid transit route in Chicago that runs north–south through the city, serving as one of the busiest lines in its subway and elevated rail system.
  • B. Red Line
    The Red Line is a major rapid transit route in the Boston metropolitan area, operated by the MBTA and running primarily north–south through key neighborhoods and suburbs.
  • C. Red Line
    The Red Line is one of the primary heavy-rail rapid transit routes in Atlanta’s MARTA system, running north–south and serving key destinations across the metropolitan area.
  • D. Red Line chosen
    Red Line was the original name of Los Angeles Metro’s B Line, a heavy-rail subway corridor serving key neighborhoods between Downtown Los Angeles and North Hollywood.
  • E. Red Line
    Red Line is one of the main rapid transit routes of the Dubai Metro, running along key areas of the city and serving many of its major commercial and residential districts.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c008b4858c819095b0199114a9a87b completed March 22, 2026, 3:20 p.m.
NER Named-entity recognition batch_69c06363d6008190bf05e003b1f74497 completed March 22, 2026, 9:47 p.m.
NED1 Entity disambiguation (via context triple) batch_69c62d17de1c8190a1f09c9e00860bcd completed March 27, 2026, 7:09 a.m.
Created at: March 22, 2026, 4:24 p.m.