Triple

T6245790
Position Surface form Disambiguated ID Type / Status
Subject Graduated Repayment Plan E139717 entity
Predicate finalPaymentLevel P42237 FINISHED
Object higher than initial payments LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: higher than initial payments | Statement: [Graduated Repayment Plan, finalPaymentLevel, higher than initial payments]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: finalPaymentLevel
Context triple: [Graduated Repayment Plan, finalPaymentLevel, higher than initial payments]
  • A. isFinalInstallmentOf
    Indicates that one work or item is the concluding or last part in a series, sequence, or collection of related works.
  • B. finalValue chosen
    Indicates the resulting or ultimate value obtained after all relevant operations, changes, or calculations have been completed.
  • C. finalPassing
    Indicates that an entity successfully completes or passes a final evaluation, test, or stage in a process.
  • D. finalPhaseOf
    Indicates that one process, stage, or event constitutes the concluding or last phase of another broader process or sequence.
  • E. finalStep
    Indicates that an action or state represents the last step or concluding stage in a process or sequence.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c008b1c5088190ae6de2555fc05ad8 completed March 22, 2026, 3:20 p.m.
NER Named-entity recognition batch_69c0631d9e648190a59ab4001f506424 completed March 22, 2026, 9:46 p.m.
PD Predicate disambiguation batch_69c056037bf88190a0a3fe7429345d0b completed March 22, 2026, 8:50 p.m.
Created at: March 22, 2026, 4:23 p.m.