Triple

T6242346
Position Surface form Disambiguated ID Type / Status
Subject Cairo Metro Line 2 E139634 entity
Predicate operator P179 FINISHED
Object Cairo Metro Organization E576652 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Cairo Metro Organization | Statement: [Cairo Metro Line 2, operator, Cairo Metro Organization]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Cairo Metro Organization
Context triple: [Cairo Metro Line 2, operator, Cairo Metro Organization]
  • A. Cairo Metro system
    The Cairo Metro system is Egypt’s primary rapid transit network serving Greater Cairo, known as the first full-fledged metro system in Africa and the Arab world.
  • B. Egyptian Company for Metro Management and Operation chosen
    The Egyptian Company for Metro Management and Operation is the state-owned enterprise responsible for running and maintaining Cairo’s urban metro network.
  • C. Cairo Metro Line 2
    Cairo Metro Line 2 is a major rapid transit line in Cairo’s metro system that runs roughly north–south through the city, connecting key districts and central hubs.
  • D. Cairo Metro Line 1
    Cairo Metro Line 1 is the first and one of the main rapid transit lines in Cairo’s metro system, connecting key districts across the city and serving central areas such as downtown near Tahrir Square.
  • E. Egyptian National Authority for Tunnels
    The Egyptian National Authority for Tunnels is a government agency responsible for planning, constructing, and managing Egypt’s major tunnel and urban rail projects, including metro and rapid transit systems.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c008b1c5088190ae6de2555fc05ad8 completed March 22, 2026, 3:20 p.m.
NER Named-entity recognition batch_69c0631933488190838b424ec0fc2155 completed March 22, 2026, 9:46 p.m.
NED1 Entity disambiguation (via context triple) batch_69c20e0d62208190928bab473ca64417 completed March 24, 2026, 4:07 a.m.
Created at: March 22, 2026, 4:23 p.m.