Triple

T6236935
Position Surface form Disambiguated ID Type / Status
Subject Maule hydropower complex E139499 entity
Predicate instanceOf P0 FINISHED
Object hydroelectric power complex C19469 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: hydroelectric power complex
Context triple: [Maule hydropower complex, instanceOf, hydroelectric power complex]
  • A. hydroelectric dam
    A hydroelectric dam is a large engineered structure that stores and controls river water to drive turbines and generate electricity while managing water flow and levels.
  • B. hydroelectric power complex vicinity
    The hydroelectric power complex vicinity is the surrounding area of a hydroelectric facility, encompassing its immediate infrastructure, environmental buffer zones, and adjacent land or water bodies influenced by its operation.
  • C. run-of-the-river hydroelectric power plant
    A run-of-the-river hydroelectric power plant is a facility that generates electricity by using the natural flow and elevation drop of a river with minimal water storage, diverting part of the river through turbines before returning it downstream.
  • D. water reservoir complex
    A water reservoir complex is an integrated system of interconnected reservoirs, infrastructure, and control facilities designed to store, manage, and distribute water for purposes such as supply, irrigation, flood control, and power generation.
  • E. multipurpose dam
    A multipurpose dam is a large engineered barrier built across a river or stream to store and regulate water for multiple uses such as irrigation, hydropower generation, flood control, water supply, and recreation.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c008b0e7ac8190808a59573ee646f3 completed March 22, 2026, 3:20 p.m.
Created at: March 22, 2026, 4:23 p.m.