Triple

T6235503
Position Surface form Disambiguated ID Type / Status
Subject Protector RG1 E139467 entity
Predicate serviceEntryPlannedFor P62980 FINISHED
Object 2020s LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 2020s | Statement: [Protector RG1, serviceEntryPlannedFor, 2020s]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: serviceEntryPlannedFor
Context triple: [Protector RG1, serviceEntryPlannedFor, 2020s]
  • A. plannedService chosen
    Indicates that a service is scheduled or intended to be provided, but has not yet occurred.
  • B. plannedServiceType
    Indicates the category or kind of service that has been scheduled or planned to be provided.
  • C. serviceEntryStatus
    Indicates the current state or condition of a service entry within a process or system (e.g., whether it is active, pending, completed, or otherwise classified).
  • D. plannedWith
    Indicates that an entity created or arranged a plan in collaboration or coordination with another entity.
  • E. serviceWith
    Indicates that one entity provides or is associated with a particular service offered to or used by another entity.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c008b0e7ac8190808a59573ee646f3 completed March 22, 2026, 3:20 p.m.
NER Named-entity recognition batch_69c062f236608190997e77b41095883f completed March 22, 2026, 9:45 p.m.
PD Predicate disambiguation batch_69c05601de6481909d0880048fd7b49a completed March 22, 2026, 8:50 p.m.
Created at: March 22, 2026, 4:23 p.m.