Triple

T6231240
Position Surface form Disambiguated ID Type / Status
Subject New Relic E139357 entity
Predicate instanceOf P0 FINISHED
Object observability platform C4107 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: observability platform
Context triple: [New Relic, instanceOf, observability platform]
  • A. orchestration platform
    An orchestration platform is a system that automates, coordinates, and manages complex workflows and services across multiple components, tools, and environments to ensure reliable and efficient operations.
  • B. data visualization platform
    A data visualization platform is a software system that enables users to transform raw data into interactive, graphical representations to explore insights, identify patterns, and communicate information effectively.
  • C. analytics platform chosen
    An analytics platform is a software system that collects, processes, and visualizes data from various sources to provide insights and support data-driven decision-making.
  • D. observational instrument
    An observational instrument is a tool or device designed to systematically capture, measure, or record data about phenomena, behaviors, or conditions in a consistent and reliable manner.
  • E. compliance platform
    A compliance platform is an integrated system that centralizes, automates, and monitors an organization’s policies, controls, and regulatory obligations to ensure ongoing adherence to internal and external requirements.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c008afd3148190b71e9eaa60420dd1 completed March 22, 2026, 3:20 p.m.
Created at: March 22, 2026, 4:22 p.m.