Triple

T6224610
Position Surface form Disambiguated ID Type / Status
Subject Southern Manifesto E139198 entity
Predicate instanceOf P0 FINISHED
Object congressional manifesto C3335 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: congressional manifesto
Context triple: [Southern Manifesto, instanceOf, congressional manifesto]
  • A. political manifesto chosen
    A political manifesto is a public written declaration that outlines a person’s or group’s core political beliefs, goals, and proposed policies intended to guide governance and persuade supporters.
  • B. revolutionary congress
    A revolutionary congress is a formal assembly of representatives convened to lead, coordinate, and legitimize a political or social revolution, often drafting new governing frameworks and strategies for transformative change.
  • C. party congress
    A party congress is a formal gathering of a political party’s delegates convened to debate policies, elect leadership, and make major organizational decisions.
  • D. Act of Congress
    An Act of Congress is a formal law or statute enacted by the United States Congress and, typically upon receiving the President’s signature or a veto override, becomes legally binding federal legislation.
  • E. political proclamation
    A political proclamation is an official public statement issued by a governing authority or political leader to declare intentions, policies, positions, or significant decisions to the populace.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c008afd3148190b71e9eaa60420dd1 completed March 22, 2026, 3:20 p.m.
Created at: March 22, 2026, 4:22 p.m.