Triple
T6223453
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Holyoke Gas and Electric hydroelectric facilities |
E139171
|
entity |
| Predicate | gridConnection |
P845
|
FINISHED |
| Object | Holyoke municipal electric system |
E139171
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Holyoke municipal electric system | Statement: [Holyoke Gas and Electric hydroelectric facilities, gridConnection, Holyoke municipal electric system]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Holyoke municipal electric system Context triple: [Holyoke Gas and Electric hydroelectric facilities, gridConnection, Holyoke municipal electric system]
-
A.
Pearl Street Station
Pearl Street Station was Thomas Edison's pioneering central power plant in New York City, widely regarded as the first commercial electric utility in the United States.
-
B.
Holyoke Gas and Electric hydroelectric facilities
chosen
The Holyoke Gas and Electric hydroelectric facilities are a network of dams and power stations on the Connecticut River that generate renewable electricity for the city of Holyoke, Massachusetts.
-
C.
Green Mountain Powerplant
Green Mountain Powerplant is a hydroelectric generating facility in Colorado that produces power as part of the Colorado-Big Thompson water storage and delivery system.
-
D.
Hyatt Powerplant
Hyatt Powerplant is a major hydroelectric generating facility in California that harnesses water from Lake Oroville as part of the State Water Project’s power and water delivery system.
-
E.
Carillon generating station
The Carillon generating station is a major hydroelectric power plant and dam complex on the Ottawa River in Quebec, Canada, known for producing electricity and facilitating navigation through its lock system.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c008aecb0c81909984b48f733ce8ae |
completed | March 22, 2026, 3:20 p.m. |
| NER | Named-entity recognition | batch_69c062c06c7881909999ba44aa4a23f9 |
completed | March 22, 2026, 9:44 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69c20dcc5e788190a510cac6bbad4830 |
completed | March 24, 2026, 4:06 a.m. |
Created at: March 22, 2026, 4:22 p.m.