Triple

T6221549
Position Surface form Disambiguated ID Type / Status
Subject Terra Nova FPSO E139125 entity
Predicate instanceOf P0 FINISHED
Object floating production storage and offloading vessel C19435 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: floating production storage and offloading vessel
Context triple: [Terra Nova FPSO, instanceOf, floating production storage and offloading vessel]
  • A. cargo vessel
    A cargo vessel is a large ship designed to transport goods and materials across bodies of water, often over long international routes.
  • B. naval auxiliary ship
    A naval auxiliary ship is a non-combat vessel that supports naval operations by providing services such as supply, repair, transport, and logistical assistance to combat ships and shore facilities.
  • C. ocean liner
    An ocean liner is a large, robust passenger ship designed for regular long-distance sea voyages, typically across oceans, with an emphasis on speed, safety, and comfort rather than leisure amenities alone.
  • D. oceanographic research ship
    An oceanographic research ship is a specialized vessel equipped with scientific instruments and laboratories for studying the physical, chemical, biological, and geological properties of the ocean.
  • E. exploration vessel
    An exploration vessel is a specialized craft designed to travel into unknown or remote regions to gather data, conduct research, and support long-duration exploratory missions.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c008aecb0c81909984b48f733ce8ae completed March 22, 2026, 3:20 p.m.
Created at: March 22, 2026, 4:22 p.m.