Triple

T6211583
Position Surface form Disambiguated ID Type / Status
Subject BMT Sea Beach Line E138881 entity
Predicate maintenanceAndRehabilitation P49938 FINISHED
Object extensive station and structural reconstruction in 2010s LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: extensive station and structural reconstruction in 2010s | Statement: [BMT Sea Beach Line, maintenanceAndRehabilitation, extensive station and structural reconstruction in 2010s]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: maintenanceAndRehabilitation
Context triple: [BMT Sea Beach Line, maintenanceAndRehabilitation, extensive station and structural reconstruction in 2010s]
  • A. maintenancePractice
    Indicates the specific actions or methods used to preserve, repair, or optimize the condition or performance of something over time.
  • B. maintenance
    Indicates that an entity performs, requires, or is involved in upkeep, repair, or preservation activities for another entity or system.
  • C. majorConstruction chosen
    Indicates a relationship where a construction project is large-scale, significant, or of primary importance in scope, impact, or resources.
  • D. maintenanceAuthority
    Indicates that one entity has the responsibility or official power to maintain, service, or keep another entity in proper working condition.
  • E. maintenanceConcept
    Indicates a conceptual or abstract relationship related to maintenance activities, strategies, or principles rather than a specific maintenance event.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c008ada364819096c9e92c74d639b5 completed March 22, 2026, 3:20 p.m.
NER Named-entity recognition batch_69c0628adccc8190b94f5c2c1d5d03f7 completed March 22, 2026, 9:43 p.m.
PD Predicate disambiguation batch_69c055fdea3c81908f5d910f0d36234a completed March 22, 2026, 8:50 p.m.
Created at: March 22, 2026, 4:21 p.m.